Petrol/LPG and Diesel Engines
Procedure of treating an engine with lubricant capacity of 2 to 10 litres (3 tubes).IMPORTANT! The full treatment means three stage process. You need a set of 3 blisters
Stage 1
Squeeze out the contents of one tube into the lubricant neck of the engine warmed up to the running temperature.
Start the engine and let it idle for no less than 2 minutes.
Stage 2
Do as described in Phase 1 after a running of 60 to 150 miles (100-250 km).
Stage 3
Do as described in Phase 2 after a running of 60 to 150 miles (100-250 km).
Revitalization is considered complete at a mileage of no less than 930 miles (1,500 km).
Note!
DO NOT CHANGE the oil until treatment has been completed!
It is possible to treat at idle: 4 hours are equivalent to a running of 120 miles (200 km).
Treat new engines with one dose: two tubes simultaneously.

Manual Transmission
XADO in Industry
Canberra
Automatic Transmission
Australia
Transmission Wear Protection
Differential Wear Protection
Moisture Removal
Reduce Friction
Diesel Endine Recondition
Manual Transmission Wear Protection
Noble Prize
Carbon C60
Water Removal
DWD2
Sydney
Melbourne
Engine Recondition
What is XADO?
Diesel Recondition
XADO Chemical Concern
Information
injector recondition
Power Booster
Hobart
Fullerene
Application Guide
Darwin
Engine Booster
Adelaide
Engine Power Increase
certificate
LPG Engine Recondition
Cylinders Recondition
Wear Protection
Verylube
fuel pump recondition
Perth
Petrol Engine Recondition
Gear Box Wear Protection
Brisbane
Fuel Tank Water Removal

